Offshore Marine and Shipbuilding

Owner: Swiber
Project: Full Detail Design of Submersible Float - Over and Launch Barge
Shipyard: BKM Group (Batam, Indonesia) & Nexus Shipyard (Batam, Indonesia)
Key Project Figures:
  • Main particulars : 160x40x12m
  • Float-over for topsides up to 18.000 t
  • Launch for Jacket up to 20.000 t
  • Dead weight capacity : 25.000 t
  • Submersible : 24m
Work Scope:
  • Design and Engineering
    • Ship Design & Marine
  • Project Management/ Assistance
    • Suppliers & Yards Follow-up assistance

Expertise
Ship Design & Marine
  Structure Design
  Structure T&I
  Float-Over
  Pipeline & SURF Design
  Pipeline & SURF T&I
  SPM/CALM Buoy design
Owner: Swiber
Project: Full Detail Design of Submersible Float –Over and Launch Barge
Shipyard: BKM Group (Batam, Indonesia) & Nexus Shipyard (Batam, Indonesia)
Key Project Figures:
  • Main particulars : 160x40x12m
  • Float-over for topsides up to 18.000 t
  • Launch for Jacket up to 20.000 t
  • Dead weight capacity : 25.000 t
  • Submersible : 24m
Work Scope:
  • Design and Engineering
    • Ship Design & Marine
  • Project Management/ Assistance
    • Suppliers & Yards Follow-up assistance

Expertise
Ship Design & Marine
  Structure Design
  Structure T&I
  Float-Over
  Pipeline & SURF Design
  Pipeline & SURF T&I
  SPM/CALM Buoy design
Owner: Swiber
Project: 4200T Derrick Lay Barge Basic and Detail Design
Shipyard: JJNS (Nantong, China)
Key Project Figures:
  • DP3 Dynamic Positioning System
  • 4.200 Mt Crane
  • 240 Mt Pipelaying tensioning capacity
  • 320 pax Accommodation
Work Scope:
  • Design and Engineering
    • Basic Design
    • Detailed Design
    • Piping Systems Design
    • Electrical Systems Design
    • Stinger Design
    • Crane Integration
    • Mooring System Integration
    • Pipe laying Equipment Integration
  • Project Management/ Assistance
    • Class Approval (BV)
    • Procurement, Follow-up and Assistance
    • Side team assistance
  • Hydrodynamics
    • Hydrostatics & Stability Booklets
    • Sea Keeping Analysis
    • Mooring, Pipe Laying & Lifting Analysis

Expertise
Ship Design & Marine
  Structure Design
  Structure T&I
  Float-Over
  Pipeline & SURF Design
  Pipeline & SURF T&I
  SPM/CALM Buoy design
Owner: Swiber
Project: KAIZEN 4000 conversion to DP
Shipyard: -
Key Project Figures:
  • 2x 4.5MW Propulsion Thrusters
  • 5x 2.2MW Retractable Thrusters
  • 2x 2.5MW Add. Generators Sets
  • Kongsberg DP3 System
  • Barge Layout segregated for DP2+ / DP3
  • Thruster Wells already built-in
  • Future Gensets location ready in E/Rs
  • Electrical System designed for upgrade

Expertise
Ship Design & Marine
  Structure Design
  Structure T&I
  Float-Over
  Pipeline & SURF Design
  Pipeline & SURF T&I
  SPM/CALM Buoy design